AVTPUMP, in collaboration with AESSEAL®, was engaged to reduce excessive water loss, energy consumption, and maintenance costs across multiple process pumps. The existing pumps were fitted with gland packing, resulting in continuous leakage of approximately 7 litres per minute. This equated to over 2.6 million litres of water lost per pump,
per year, alongside increased energy usage and ongoing repair costs.

The Challenge

The pumps are critical to maintaining production. The existing sealing arrangement created several issues:

  • Uncontrolled water loss
  • Excessive shaft wear requiring frequent replacement
  • Increased power consumption due to friction
  • Regular maintenance intervention.

This resulted in high operating costs, reduced reliability, and inefficiency across the plant.

Our Approach

Following site visits and technical review, AVTPUMP and AESSEAL® worked together to assess the application and develop a more efficient and reliable sealing solution. The focus was to eliminate uncontrolled leakage, reduce energy consumption, and improve overall asset reliability.

The Solution

All pumps were upgraded to an 80mm dual CDSA mechanical seal, supported by a W2 seal support system. This provided:

  • Controlled sealing with minimal water loss
  • Reduced friction on the shaft, lowering power requirements
  • Extended service intervals
  • Improved reliability and reduced maintenance

Water loss was reduced from 7 litres per minute to negligible vapour levels.

Follow-Up

The upgrade delivered a significant improvement in performance and efficiency across all pumps. Operating costs were reduced substantially, with savings in water, energy, and maintenance. The total running cost of a single pump with gland packing, previously estimated at over £45,000 per year, was dramatically reduced. The investment in the upgraded sealing solution achieved full payback in less than two months. In addition, the plant benefited from improved reliability, reduced downtime, and a cleaner, safer working environment.

"The upgrade delivered immediate improvements in reliability, while significantly reducing water, energy, and maintenance costs."

Related Case Studies

End Suction Pump Repaired Following Shaft Failure
End Suction Pump Repaired Following Shaft Failure
Read More
Critical Tar Pump Overhaul Following Product Build-Up
Critical Tar Pump Overhaul Following Product Build-Up
Read More
Third Party Repair
Third Party Repair
Read More