Working to Achieve

AVTPUMP was asked by an existing chemical manufacturing customer to investigate a potential reliability concern affecting several magnetic drive pumps handling acetic anhydride.

Previous repair reports had highlighted gasket degradation and associated loss-of-containment concerns. The objective was to review whether the existing casing gasket material was suitable for the duty and establish a more reliable long-term specification.

The Challenge

The pumps perform a critical process duty where reliable chemical containment is essential. Degradation of the casing gasket could allow process fluid to enter the coupling housing, creating safety and environmental concerns alongside the risk of unplanned shutdown and significant maintenance intervention.

With similar issues recorded across several pumps, the customer needed a solution that could be implemented consistently rather than treating each failure individually.

Our Approach

AVTPUMP reviewed the history of repairs and the existing PTFE gasket specification. The investigation focused on whether permeation of acetic anhydride through the gasket material could be contributing to the deterioration seen in service.

The Solution

The existing conventional PTFE casing gaskets were replaced with an upgraded gasket material selected to reduce the potential for chemical permeation and improve long-term sealing integrity.

Following successful implementation, the customer issued a formal plant modification document to standardise the change. AVTPUMP also liaised with the original equipment manufacturer to ensure the relevant documentation reflected the revised gasket specification, helping ensure future repairs are completed consistently to the new standard.

Follow-Up

Since implementation of the upgrade programme, no further gasket failures have been identified.

By moving from individual repairs to a controlled plant-wide modification, the customer has improved containment reliability and established a consistent specification for future maintenance of these critical pumps.

"“The value of this project was in turning a recurring reliability concern into a controlled engineering standard. Since the upgraded gasket specification was implemented, no further gasket failures have been identified.”"

AVTPUMP Engineer

At a Glance

  • Industry: Chemical Manufacturing
  • Equipment: Magnetic drive process pumps
  • Services: Reliability review, technical assessment, gasket upgrade programme and specification standardisation
  • Upgrade: Improved casing gasket material for acetic anhydride service
  • Key Issue: Suspected chemical permeation contributing to gasket degradation and loss-of-containment risk
  • Outcome: No further gasket failures identified following implementation of the upgraded specification

Related Case Studies

When a Previous Pump Repair Falls Short
When a Previous Pump Repair Falls Short
Read More
Supply Long Coupled Pump
Supply Long Coupled Pump
Read More
Third Party Repair
Third Party Repair
Read More